ZE PAK SA 2021 AR2
The report highlights ZE PAK SA Capital Group's performance and strategic transition from coal to renewable energy in 2021. The company commissioned Poland's largest photovoltaic farm in Brudzew with a capacity of 70 MWp and completed the modernization of a biomass unit at Konin Power Plant. Additionally, the Group advanced its green hydrogen production plans and developed a prototype for a hydrogen-powered city bus. Despite a net loss of PLN 317.4 million due to asset impairment write-downs, the Group achieved an EBITDA of PLN 243.1 million and reduced its CO2 emissions by 11.6% year-on-year.
Company: ZE PAK SA
Sector: Utilities
Country: Poland
Year: 2021
Type: AR2
Pages: 118
ZE PAK SA
Management Board'S Report From The Capital Group'S Operation
The report highlights ZE PAK SA Capital Group's performance and strategic transition from coal to renewable energy in 2021. The company commissioned Poland's largest photovoltaic farm in Brudzew with a capacity of 70 MWp and completed the modernization of a biomass unit at Konin Power Plant. Additionally, the Group advanced its green hydrogen production plans and developed a prototype for a hydrogen-powered city bus. Despite a net loss of PLN 317.4 million due to asset impairment write-downs, the Group achieved an EBITDA of PLN 243.1 million and reduced its CO2 emissions by 11.6% year-on-year.
Sign in for free to access detailed sustainability data, reporting standards, and ESG metrics.
Document Details
Report Year
2021
Reporting Period
Jan 1, 2021 - Dec 31, 2021
Fiscal Year
2021
Published
Apr 28, 2022
Type
Annual Report with Sustainability Disclosures
Language
English
Pages
File Size
Standards & Assurance
Reporting Standards
ESG Data?Experimental — AI-extracted data, may contain inaccuracies
Emissions
Scope 1:
Scope 2:
Scope 3:
Renewable Energy
Water Consumption
Total Waste
Workplace Fatalities
Employees