AB Ignitis Grupe 2025 IR
The report highlights Ignitis Group's strategic progress in 2025, during which the company increased its installed green capacity by 0.7 GW to reach 2.1 GW. Key milestones included reaching commercial operation dates at several wind and solar farms, such as the Kelmė wind farm in Lithuania and the Silesia wind farm II in Poland. Financially, the company achieved an Adjusted EBITDA of EUR 546.1 million, representing a 3.4% year-on-year increase. On the sustainability front, the company successfully completed its mass smart meter roll-out with 1.3 million meters installed and was recognized on the CDP Climate A List.
Company: AB Ignitis Grupe
Sector: Utilities
Country: Lithuania
Year: 2025
Type: IR
Pages: 451
AB Ignitis Grupe
Integrated Annual Report
The report highlights Ignitis Group's strategic progress in 2025, during which the company increased its installed green capacity by 0.7 GW to reach 2.1 GW. Key milestones included reaching commercial operation dates at several wind and solar farms, such as the Kelmė wind farm in Lithuania and the Silesia wind farm II in Poland. Financially, the company achieved an Adjusted EBITDA of EUR 546.1 million, representing a 3.4% year-on-year increase. On the sustainability front, the company successfully completed its mass smart meter roll-out with 1.3 million meters installed and was recognized on the CDP Climate A List.
Sign in for free to access detailed sustainability data, reporting standards, and ESG metrics.
Document Details
Report Year
2025
Reporting Period
Jan 1, 2025 - Dec 31, 2025
Fiscal Year
2025
Type
Integrated Report
Language
English
Pages
File Size
Standards & Assurance
Reporting Standards
Materiality Assessment
Assurance
Assurance Provider
Assurance Standard
ESG Data?Experimental — AI-extracted data, may contain inaccuracies
Emissions
Scope 1:
Scope 2:
Scope 3:
Energy Consumption
Renewable Energy
Water Consumption
Total Waste
Women on Board
Women in Management
Workplace Fatalities
Net Zero Target
Employees