Hokuriku Electric Power Co 2019 IR
The report details the Hokuriku Electric Power Group's transition to its first integrated report, combining financial and sustainability disclosures for the fiscal year 2018. Key highlights include the establishment of the Group's 2030 Long-term Vision and the First Mid-term Business Plan (FY 2019-2022) to expand its comprehensive energy business and cultivate new growth areas. The company successfully turned a profit in non-consolidated settlements and commenced commercial operations of its first LNG-fired power station, Toyama Shinko Thermal Power Station Unit 1, to reduce carbon emissions. Additionally, the Group advanced its renewable energy targets, aiming to increase production by 2.0 billion kWh by 2030, while continuing safety improvement works at the Shika Nuclear Power Station.
Company: Hokuriku Electric Power Co
Sector: Utilities
Country: Japan
Year: 2019
Type: IR
Pages: 31
Hokuriku Electric Power Co
Integrated Report
The report details the Hokuriku Electric Power Group's transition to its first integrated report, combining financial and sustainability disclosures for the fiscal year 2018. Key highlights include the establishment of the Group's 2030 Long-term Vision and the First Mid-term Business Plan (FY 2019-2022) to expand its comprehensive energy business and cultivate new growth areas. The company successfully turned a profit in non-consolidated settlements and commenced commercial operations of its first LNG-fired power station, Toyama Shinko Thermal Power Station Unit 1, to reduce carbon emissions. Additionally, the Group advanced its renewable energy targets, aiming to increase production by 2.0 billion kWh by 2030, while continuing safety improvement works at the Shika Nuclear Power Station.
Sign in for free to access detailed sustainability data, reporting standards, and ESG metrics.
Document Details
Report Year
2019
Reporting Period
Apr 1, 2018 - Mar 31, 2019
Fiscal Year
2018
Type
Integrated Report
Language
English
Pages
File Size
Standards & Assurance
Reporting Standards
Materiality Assessment
Assurance
ESG Data?Experimental — AI-extracted data, may contain inaccuracies
Total Waste
Employees