Mt Owen Pty Ltd 2015 SR
The report details the environmental and social performance of the Mt Owen Complex for the 2015 calendar year. During this period, the complex produced 13.87 million tonnes of run-of-mine coal and achieved its rehabilitation target by restoring 70.3 hectares of disturbed land. Air quality, surface water, and groundwater monitoring results remained largely within predicted limits and compliant with regulatory standards. The company also engaged with the local community through consultative meetings and contributed over $35,000 to various local organizations and events.
Company: Mt Owen Pty Ltd
Sector: Mining & quarrying
Country: Australia
Year: 2015
Type: SR
Pages: 139
Mt Owen Pty Ltd
The report details the environmental and social performance of the Mt Owen Complex for the 2015 calendar year. During this period, the complex produced 13.87 million tonnes of run-of-mine coal and achieved its rehabilitation target by restoring 70.3 hectares of disturbed land. Air quality, surface water, and groundwater monitoring results remained largely within predicted limits and compliant with regulatory standards. The company also engaged with the local community through consultative meetings and contributed over $35,000 to various local organizations and events.
Sign in for free to access detailed sustainability data, reporting standards, and ESG metrics.
Document Details
Report Year
2015
Reporting Period
Jan 1, 2015 - Dec 31, 2015
Fiscal Year
2015
Type
Sustainability Report
Language
English
Pages
File Size
Standards & Assurance
ESG Data?Experimental: AI-extracted data, may contain inaccuracies
Employees