Mt Owen Pty Limited 2017 SR
The report details the environmental and operational performance of the Mt Owen Complex for the 2017 calendar year. The complex produced 13.96 million tonnes of run-of-mine coal and loaded 889 trains. Key highlights include the implementation of a revised rehabilitation monitoring program using a biometric approach, resulting in 83 hectares of completed rehabilitation. The site also undertook extensive fauna monitoring, recording 26 threatened species since 1996, and completed compensatory planting of 2,000 River Oak trees. Despite dry conditions, the complex maintained compliance with most noise, blasting, and water management criteria, though one short-term PM10 exceedance was recorded.
Company: Mt Owen Pty Limited
Sector: Mining & quarrying
Country: Australia
Year: 2017
Type: SR
Pages: 110
Mt Owen Pty Limited
The report details the environmental and operational performance of the Mt Owen Complex for the 2017 calendar year. The complex produced 13.96 million tonnes of run-of-mine coal and loaded 889 trains. Key highlights include the implementation of a revised rehabilitation monitoring program using a biometric approach, resulting in 83 hectares of completed rehabilitation. The site also undertook extensive fauna monitoring, recording 26 threatened species since 1996, and completed compensatory planting of 2,000 River Oak trees. Despite dry conditions, the complex maintained compliance with most noise, blasting, and water management criteria, though one short-term PM10 exceedance was recorded.
Sign in for free to access detailed sustainability data, reporting standards, and ESG metrics.
Document Details
Report Year
2017
Reporting Period
Jan 1, 2017 - Dec 31, 2017
Fiscal Year
2017
Type
Sustainability Report
Language
English
Pages
File Size
Standards & Assurance
Assurance
Assurance Standard
ESG Data?Experimental: AI-extracted data, may contain inaccuracies
Employees