Pražské vodovody a kanalizace AS 2024 AR2
The report outlines the 2024 operational and environmental performance of Prazske vodovody a kanalizace, a.s. (PVK). Key achievements include the completion of a unique hospital wastewater treatment plant at Thomayer University Hospital and the installation of solar panels across 15 sites. PVK successfully managed three flood events and conducted a large-scale power outage drill to test infrastructure resilience. The company calculated its operational carbon footprint at 223,616.3 tonnes of CO2 equivalent using the GHG Protocol and continued its transition toward carbon neutrality through biogas valorization and fleet electrification.
Company: Pražské vodovody a kanalizace AS
Country: Czech Republic
Year: 2024
Type: AR2
Pages: 62
Pražské vodovody a kanalizace AS
The report outlines the 2024 operational and environmental performance of Prazske vodovody a kanalizace, a.s. (PVK). Key achievements include the completion of a unique hospital wastewater treatment plant at Thomayer University Hospital and the installation of solar panels across 15 sites. PVK successfully managed three flood events and conducted a large-scale power outage drill to test infrastructure resilience. The company calculated its operational carbon footprint at 223,616.3 tonnes of CO2 equivalent using the GHG Protocol and continued its transition toward carbon neutrality through biogas valorization and fleet electrification.
Sign in for free to access detailed sustainability data, reporting standards, and ESG metrics.
Document Details
Report Year
2024
Reporting Period
Jan 1, 2024 - Dec 31, 2024
Fiscal Year
2024
Type
Annual Report with Sustainability Disclosures
Language
English
Pages
File Size
Standards & Assurance
Reporting Standards
Materiality Assessment
ESG Data?Experimental: AI-extracted data, may contain inaccuracies
Emissions
Scope 1:
Scope 2:
Scope 3:
Total Waste
Employees