Wesizwe Platinum Ltd 2017 IR
The report details Wesizwe Platinum Limited's progress in developing the Bakubung Platinum Mine (BPM) during the 2017 financial year. Key achievements included reaching a total flat development of 1,217 meters, completing the main shaft equipping, and commissioning the 77 level substation. The company maintained a strong safety record with zero fatalities and a Lost Time Injury Frequency Rate of 0.54, well below its target of 0.86. Additionally, Wesizwe invested R53.9 million in social and labour plan projects, including the Gabonewe Housing Estate and the Bakubung Farming Project.
Company: Wesizwe Platinum Ltd
Sector: Materials
Country: South Africa
Year: 2017
Type: IR
Pages: 108
Wesizwe Platinum Ltd
The report details Wesizwe Platinum Limited's progress in developing the Bakubung Platinum Mine (BPM) during the 2017 financial year. Key achievements included reaching a total flat development of 1,217 meters, completing the main shaft equipping, and commissioning the 77 level substation. The company maintained a strong safety record with zero fatalities and a Lost Time Injury Frequency Rate of 0.54, well below its target of 0.86. Additionally, Wesizwe invested R53.9 million in social and labour plan projects, including the Gabonewe Housing Estate and the Bakubung Farming Project.
Sign in for free to access detailed sustainability data, reporting standards, and ESG metrics.
Document Details
Report Year
2017
Reporting Period
Jan 1, 2017 - Dec 31, 2017
Fiscal Year
2017
Type
Integrated Report
Language
English
Pages
File Size
Standards & Assurance
Reporting Standards
Materiality Assessment
Assurance
Assurance Provider
Assurance Standard
ESG Data?Experimental: AI-extracted data, may contain inaccuracies
Emissions
Scope 1:
Scope 2:
Energy Consumption
Water Consumption
Workplace Fatalities
Employees