Hindustan Zinc Ltd 2011 AR2
The report highlights Hindustan Zinc Limited's operational, financial, and sustainability performance for the fiscal year 2010-2011. The company achieved record refined zinc production of 712,471 tonnes and refined silver production of 179,079 kg, driving a 24% revenue increase to ₹9,912 crores. Key milestones included the commissioning of a 1.50 mtpa concentrator at the Sindesar Khurd mine and a 160 MW captive power plant at the Dariba Smelting Complex. In sustainability, green energy contributed 24% of total power capacity, and specific water consumption at smelters was reduced by 36% over four years.
Company: Hindustan Zinc Ltd
Sector: Mining & quarrying
Country: India
Year: 2011
Type: AR2
Pages: 108
Hindustan Zinc Ltd
The report highlights Hindustan Zinc Limited's operational, financial, and sustainability performance for the fiscal year 2010-2011. The company achieved record refined zinc production of 712,471 tonnes and refined silver production of 179,079 kg, driving a 24% revenue increase to ₹9,912 crores. Key milestones included the commissioning of a 1.50 mtpa concentrator at the Sindesar Khurd mine and a 160 MW captive power plant at the Dariba Smelting Complex. In sustainability, green energy contributed 24% of total power capacity, and specific water consumption at smelters was reduced by 36% over four years.
Sign in for free to access detailed sustainability data, reporting standards, and ESG metrics.
Document Details
Report Year
2011
Reporting Period
Apr 1, 2010 - Mar 31, 2011
Fiscal Year
2011
Type
Annual Report with Sustainability Disclosures
Language
English
Pages
File Size
Standards & Assurance
Reporting Standards
ESG Data?Experimental: AI-extracted data, may contain inaccuracies
Renewable Energy
Workplace Fatalities
Employees